17
DraftS05-CON-011v0.1Source imported
Section 43 of 55
PART IV — Robotic Tasks, Assembly & Lifecycle Operations
Stable section ID: S05-CON-011-SECTION-43 · 30 content blocks
- Robotic Task Architecture
- Robot Capability Manifest
- Robotic Job and Work Package
- Task Preconditions
- Robotic Process Planning
- Assembly Sequence Planning
- Temporary-State Planning
- Motion and Path Planning
- Collision Avoidance
- Workcell and Construction-Site Setup
- Component Identification and Retrieval
- Picking and Grasp Verification
- Lifting and Transportation
- Positioning and Alignment
- Capture and Insertion
- Locking and Fastening
- Joining and Sealing Operations
- Utility Connection Operations
- Robotic Inspection and Quality Control
- Robotic Commissioning Assistance
- Task Completion and Outcome Verification
- Exception and Obstruction Detection
- Retry and Recovery Procedures
- Safe Pause and Resume
- Abort, Retreat and Safe Withdrawal
- Human Approval and Task Handover
- Multi-Robot Coordination
- Fleet, Resource and Charging Management
- Inspection, Maintenance and Service Robots
- Robotic Deconstruction and Material Recovery