Section 70 of 104
68. Authority Having Jurisdiction Engagement
Stable section ID: S05-CON-016-SECTION-70 · 18 content blocks
System05 deployment shall include early and continuous engagement with the relevant Authorities Having Jurisdiction.
Engagement should begin before final Product design or permit submission where System05 introduces unfamiliar Components, Interfaces, digital records, or construction methods.
The engagement package should explain:
the System05 architecture;
applicable code pathways;
structural and fire behavior;
Product and Interface Evidence;
manufacturing control;
inspection methods;
professional responsibilities;
BIOS and digital-record functions;
- limitations and proposed conditions of approval.
- Questions, objections, interpretations, conditions, and required compensating measures shall be recorded.
System05 terminology shall be translated into the legal and technical language used by the jurisdiction without misrepresenting the technology.
Digital verification and sensor data may supplement inspection but shall not replace legally required inspection unless explicitly authorized.
Approval in one jurisdiction shall not be represented as approval elsewhere.
System05 shall support authorities with reference specimens, training, test results, inspection guides, and access to qualified technical personnel.
Regulatory engagement shall remain factual and shall not pressure authorities to accept claims unsupported by Evidence.